About the Project

Gables Westcreek is a 15-story apartment development with 295 units, 4 level garage and 11 levels of residential PT slabs totaling 783,000 square feet. Building Concrete Solutions worked closely with all trades involved in the project to productively and efficiently install formwork to allow other trades to get their work done in accordance with the schedule. Utilizing Alshor SK Grid System (6’x8’), BCS met the unique needs of this high-rise that required substantial amount of “flat slabs”. This forming system allowed the team to continue framing without the constant need of the tower crane. Once concrete strength was achieved, all ledgers and joists could be released and moved to the next area while keeping the structure supported. Alshor Plus tables were used at the perimeter to keep crews safe and to maintain the perimeter as the tables were flown to the next level.

The Details

Type: New Construction
Components: Vertical and Elevated Concrete, Concrete Placement, Concrete Finishing
Sector(s): Multi-Family
Client: Gables Residential

Safety Fact

We combine active executive leadership, project management, and a well-trained and engaged workforce to achieve an unparalleled safe work environment. By maintaining an accident free workplace, we protect the integrity and value of our fellow worker.

Partners

  • General Contractor: JE Dunn

Similar Projects

Ask for the team that starts
with T.

Tellepsen is a family of companies with expertise in commercial, industrial, interior, concrete and other services.