About the Project

Through a rigorous academic program rooted in the Catholic faith, Frassati Catholic High School produces graduates who will be committed to life-long learning, spiritual growth and social justice. The school is constructed on a 62 acre campus in Spring, Texas, with a planned capacity of 1,200 students. The multi-phased campus includes classroom/administrative space, gymnasium, athletic fields and related infrastructure. The school’s mission is to educate graduates to be agents of change in all sectors of society, building a culture that embodies the truth about the human person who is destined to share in God’s own divine life.

The Numbers

  • 28,000

    Sq Ft
  • 9 months

    Duration
  • 2

    Floors

The Details

Type: New
Components: Gymnasium, Cafeteria, Surface Parking, Site Work, Classrooms, Administrative Offices
Method: Construction Manager at Risk
Sector(s): Faith-Based, K-12
Client: Archdiocese of Galveston-Houston

Tech Perspective

Tellepsen’s project management technology tools have been designed and customized to make sure that all project members, including Tellepsen project staff, Tellepsen management, designers, owners, and subcontractors have access to all the information they need, real-time at their fingertips.

Partners

  • Architect: Jackson & Ryan Architects
  • MEP Engineer: I A Naman Associates Inc.
  • Structural Engineer: Matrix Structural Engineers
  • Civil Engineer: Ward, Getz and Associates

Similar Projects

Ask for the team that starts
with T.

Tellepsen is a family of companies with expertise in commercial, industrial, interior, concrete and other services.