About the Project


The 68,000 square foot Central Control Building is the control facility for every processing unit (24) at the Texas City Plant Site. It is being constructed to blast resistant standards and to withstand a Category V hurricane and provide a shelter in place location for operators within the plant. There is redundancy for all systems, so the mission critical facility will never experience any down time. The project includes an adjoining employee parking lot.

The Numbers

  • 68,000

    Sq Ft
  • 3

    Levels
  • 21 months

    Duration

The Details

Type: New
Components: Central Plant, Data Center
Method: Construction Manager at Risk
Sector(s): Infrastructure and Plant
Client: Marathon Petroleum Corporation

Partners

  • Architect: Jacobs Engineering