About the Project

A multi-component and phased project, it included 261,500 square feet garage foundation and structure, 26,500 square feet attached elevated structure and 11,580 square feet bridge to existing hospital. As project speed was an important factor, BCS chose to utilize EFCO’s Cunningham Garage System which allowed for pre-assembly of all the beam troughs at the fabrication yard. In addition, all columns form, beam sides and slab tables were pre-assembled ensuring the highest quality and safety were achieved through a controlled environment. BIM models were used to look ahead to manage potential conflicts and challenges.

The Details

Type: New Construction
Components: Structured Parking, Elevated Concrete, Foundation, Concrete Material, Concrete Placement, Concrete Finishing
Sector(s): Healthcare, Parking
Client: University of Texas Medical Branch

Technology Fact

Building Concrete Solutions has partnered with a professional drone service company on all applicable projects to provide a customizable package of regular project images and videos. By developing this partnership, we can be sure we have: the latest equipment; proper safety measures; necessary risk management policies; compliance with regulatory and training requirements; and the most innovative uses of drones.

Partners

  • General Contractor: Hensel Phelps

Similar Projects

Ask for the team that starts
with T.

Tellepsen is a family of companies with expertise in commercial, industrial, interior, concrete and other services.