About the Project

The 64,000 square foot research and development facility was constructed under a fast track schedule. Completed in seven months, the facility includes copper shielded rooms that house scanning electron microscopes. The research environment required complex mechanical, electrical and plumbing systems with over 500 floor and 300 roof penetrations. Despite the very aggressive schedule, the project was completed substantially below the total authorized maximum amount.

The Numbers

  • 64,000

    Sq Ft
  • One

    Floors
  • 7 Months

    Duration

The Details

Type: New Construction
Components: Laboratory, research facilities
Method: Construction Manager at Risk
Sector(s): Lab / Research / Life Sciences
Client: British Petroleum

Partners

  • Architect: Trammel Crow