About the Project

Located on the 2,000-acre RELLIS Academic Campus in Bryan, Texas, Phase II of the work consisted of a 3-story, 48,000-square foot academic building featuring a seminar classroom, lecture classrooms, auditorium, laboratories, faculty offices, resource center, and spaces for student collaboration.

The laboratory spaces incorporate state-of-the-art teaching and technology and consist of a materials and fluid thermodynamics lab, robotics and mechatronics, programming and software, electronics and circuits, SCADA, computer engineering/network, Capstone design and prototyping laboratories.

The Numbers

  • 48,000

    Sq Ft
  • 3

    Floors
  • 14 months

    Duration
  • 2

    Acres

The Details

Type: New
Components: Seminar classrooms, lecture classrooms, auditorium, laboratories, faculty offices, resource center
Method: Construction Manager at Risk
Sector(s): Higher Education
Client: Texas A&M University System

Partners

  • Architect: Page
  • MEP Engineer: AEI Engineering
  • Structural Engineer: Ensight Haynes Whaley
  • Civil Engineer: Gessner

Similar Projects

Ask for the team that starts
with T.

Tellepsen is a family of companies with expertise in commercial, industrial, interior, concrete and other services.